Appendix A – Active or planned, commercial scale, integrated projects by asset lifecycle stage

The notations, units and acronyms used within the following tables are summarised below.

  • Dependent (D) – Projects that are capture, transport or storage related in the database but are integrated with secondary capture, transport or storage projects to form an integrated CCS system.
  • Separate (S) – In the database, these are listed as two separate projects.
  • CFB – Circulating Fluidised Bed.
  • SNG – Synthetic Natural Gas.
  • NG – Natural Gas.
  • LNG – Liquefied Natural Gas.
  • PFBC – Pressurised Fluidised Bed Combustion.
  • Mt – million tonnes.

Table A-1 Active or planned, commercial scale, integrated projects at the Identify stage

Ref. No Project Name State/District, Country Estimated Operation Date Capture Facility Capture Type Transport Type Storage Type Approx. CO2 Storage Rates
1 AEP Northeastern CO2 Capture Project (D) Oklahoma, USA 2011 200 MW slipstream from 450 MW coal fired power plant Post-combustion Pipeline Beneficial reuse (EOR) 1.5 Mtpa
2 Sargas Husnes (D) Hordaland, Norway 2012 4×100 MW PFBC coal fired power plant Post-combustion TBD / not specified Beneficial reuse (EOR) 2.6 Mtpa
3 Karsto Rogaland, Norway 2012 420 MW Natural gas fired power plant Post combustion Pipeline Geological (saline aquifer) 1.0 Mtpa
4 Rotterdam CGEN (D) Rotterdam, Netherlands 2014 450 MW Hard coal / biomass / gas hydrogen power plant Pre-combustion Pipeline / Ship Beneficial reuse (EGR) or geological (depleted oil/gas field) 2.5 Mtpa
5 Lassie (D) Victoria, Australia 2015 Various Various Pipeline Geological >1.0 Mtpa
6 Ledvice (D) North Bohemia, Czech Republic 2015 660 MW Coal fired power plant Post-combustion Pipeline Geological 1.1 Mtpa
7 Siekierki Mokotów district, Poland 2015 480 MW Coal fired power plant Post-combustion Pipeline Geological 2.5 Mtpa
8 Janschwalde Brandenburg, Germany 2015 250 MW coal oxyfiring power plant, 125 MW coal fired for PCC Oxyfiring and post-combustion 150 km Pipeline Geological (saline aquifer) 1.8 Mtpa (Oxyfiring) 0.9 Mtpa (PCC)
9 Shell/Essent Project (D) South-West Netherlands 2015 450-1,000 MW Coal and biomass/pitch IGCC power plant Pre-combustion Pipeline Geological (depleted oil/gas field) 2.0-4.0 Mtpa
10 Nuon Magnum Groningen, Netherlands 2015 1,200 MW Hard coal / biomass / gas IGCC power plant Pre-combustion Pipeline Geological (depleted gas field) 2.0 Mtpa
11 Compastilla Project Leon, Spain 2015 300 MWe Coal oxyfiring power plant Oxyfiring 80-90 km Pipeline Geological (saline aquifer) TBD / not specified
12 Porto Tolle Rovigo, Italy 2015 3×660 MW Coal fired power plant (capture from 1 unit) Post-combustion Pipeline Geological (saline aquifer) 1.0 Mtpa
13 Rotterdam Afvang en Opslag Demo Zuid-Holland, Netherlands 2015 250 MWe capture unit on 800 MW Coal/biomass fired power plant Post-combustion 25 km Pipeline Geological (depleted oil/gas field) 1.1 Mtpa
14 FuturGas South Australia, Australia 2017 Coal to liquids (producing diesel and naphtha / power / sulphur) Pre-combustion 80-200 km Pipeline Geological (saline aquifer and/or depleted oil/gas field) 1.6 Mtpa
15 Yulin Chemical Plant Shanxi Province, China TBD / not specified Coal to liquids (coal to chemicals being studied) Pre-combustion Pipeline TBD / not specified 5.0–10.0 Mtpa
16 BKK Gasskraftverk Mongstad (D) Hordaland, Norway TBD / not specified 450 MW Natural gas fired power Post-combustion Pipeline Geological (saline aquifer) 1.0 Mtpa
17 Kalundborg Sjælland, Denmark TBD / not specified 600 MW Coal fired power plant Post-combustion TBD / not specified Geological (saline aquifer) 3.4 Mtpa
18 SEI - Saline Joniche Reggion Calabria, Italy TBD / not specified 1,320 MW Coal fired power plant Post-combustion Truck or pipeline Geological (saline aquifer) 8.0 Mtpa
19 Tilbury Clean Coal Power Station (D) Essex, England TBD / not specified 2×800 MW Power (coal & biomass) captured from 300 MW net Post-combustion 150 km Pipeline TBD / not specified 4.0 Mtpa

 

Table A-2 Active or planned, commercial scale, integrated projects at the Evaluate Stage

Ref. No Project Name State/District, Country Estimated Operation Date Capture Facility Capture Type Transport Type Storage Type Approx. CO2 Storage Rates
20 PCOR Ft Nelson (D) British Columbia, Canada 2011 Gas processing facility NG processing 78 km Pipeline Geological (saline aquifer) 1.6 Mtpa
21 Bintulu Malaysia 2011 LNG plant (gas processing) NG processing TBD / not specified Geological (saline aquifer and/or depleted oil/gas field) 3.0 Mtpa
22 W.A. Parish (D) Texas, USA 2012 125 MW equivalent, coal fired power plant Post-combustion TBD / not specified Beneficial reuse 1.0 Mtpa
23 HYPOGEN (D) Hamburg region, Norway 2014 400 MW Gas/coal hydrogen and power plant Pre-combustion Pipeline, ship or combined Geological 2.5 Mtpa
24 Tenaska Texas, USA 2014 600 MW net Coal fired power plant Post-combustion Pipeline Beneficial reuse (EOR) 4.3 Mtpa
25 Taylorville IGCC (D) Illinois, USA 2014 500–525 MW IGCC (coal) power plant Pre-combustion TBD Geological and/or beneficial reuse TBD
26 Kingsnorth Kent, England 2014 300–400 MWe equivalent capture on 1,600 MW Coal fired power station Post-combustion 270 km Pipeline Geological (depleted gas field) 2.0 Mtpa
27 Hatfield (D) South Yorkshire, England 2014 900 MW gross IGCC (coal) power plant Pre-combustion 80 km Pipeline Geological (saline aquifer and/or depleted oil/gas field) 4.75 Mtpa
28 ZeroGen Queensland, Australia 2015 400 MW IGCC (coal) power plant Pre-combustion 100 km Pipeline Geological (saline aquifer) 2.0 Mtpa
29 Browse LNG Western Australia, Australia 2015 LNG plant (gas processing) NG Processing Pipeline Geological (saline aquifer and/or depleted oil/gas field) 3.0 Mtpa
30 Wandoan Power (D) Queensland, Australia 2015 400 MW net IGCC (coal) power plant Pre-combustion Up to 200 km Pipeline Geological or beneficial reuse (EOR) 2.5 Mtpa
31 Kedzierzyn Opole Province, Poland 2015 300 MW Coal/biomass polygeneration IGCC power plant Pre-combustion Pipeline Geological 2.4 Mtpa
32 Belchatow Łódź Voivodeship province, Poland 2015 858 MW Coal fired power plant Post-combustion Pipeline Geological (saline aquifer) 1.7 Mtpa
33 FINNCAP - Meri Pori (D) Pori, Finland 2015 565 MW Coal fired power plant Post-combustion 800-2000 km Ship Geological 2.4 Mtpa
34 Eston Grange Teesside, England 2015 850 MW Coal/petcoke fired IGCC power plant Pre-combustion 250 km Pipeline Geological (saline aquifer or depleted oil/gas field) 4.2 Mtpa
35 Southern California Edison IGCC (D) Utah, USA 2017 600 MW Coal IGCC power plant Pre-combustion Pipeline Geological (saline aquifer) or Beneficial reuse (EOR) 3.0 Mtpa
36 GreenGen Tianjin, China 2020 1×400 MW IGCC (coal) power plant Pre-combustion TBD / not specified Beneficial reuse (EOR) and/or geological TBD / not specified
37 Coolimba Western Australia, Australia TBD / not specified 2×200 MW or 3×150 MW Coal fired CFB power plant Post-combustion 20-80 km Pipeline Geological (depleted oil/gas field) 3.0 Mtpa
38 Dongguan Guangdong, China TBD / not specified 800 MW IGCC (coal) power plant Pre-combustion TBD / not specified Geological (depleted oil field) 0.1-1.0 Mtpa
39 Lianyungang Jiangsu, China TBD / not specified 1,200 MW IGCC and 1,300 MW ultra supercritical PC power plants (coal) – co- producing SNG and chemicals Pre and post-combustion TBD / not specified Beneficial reuse (EOR) 0.1-1.0 Mtpa

 

Table A-3 Active or planned, commercial scale, integrated projects at the Define stage

Ref. No Project Name State/District, Country Estimated Operation Date Capture Facility Capture Type Transport Type Storage Type Approx. CO2 Storage Rates
40 SWP Entrada (D) Wyoming, USA 2009 Gas Processing NG processing Pipeline Geological 1.1 Mtpa
41 Lockwood Gasification (D) Texas, USA 2009 (break ground) SNG Plant Pre-combustion Pipeline Beneficial reuse (EOR) 7.2 Mtpa
42 Antelope Valley and Williston Basin (D,S) North Dakota, USA 2012 120 MW slipstream from 450 MW coal fired power plant Post-combustion Pipeline Beneficial reuse (EOR) 1.0 Mtpa
43 Masdar (D) (S) United Arab Emirates 2013 Multiple – Hydrogen Power Abu Dhabi (HPAD) power plant (1.8 Mtpa), steel (0.8 Mtpa), aluminium smelter (1.7 Mtpa) Post-combustion 300 km Pipeline Beneficial reuse (EOR) 4.3 Mtpa
44 Aalborg (Nordjyllandsvaerket) Nordjylland, Denmark 2014 Coal fired power plant – 300 MWe net with CCS Post-combustion 30 km Pipeline Geological (saline aquifer) 1.9 Mtpa
45 Longannet (D) Fife, Scotland 2014 4×600 MW Coal/biomass fired power station (1 unit with capture) Post-combustion Pipeline or ship Geological (depleted oil/gas field) 2.0 Mtpa
46 Gorgon Project Western Australia, Australia 2015 (est.) LNG plant (gas processing) NG processing Pipeline Geological (saline aquifer) 3.4 Mtpa
47 Genesee CCS Project (D) (S) Alberta, Canada 2015 252 MW net IGCC (coal) power plant Pre-combustion Pipeline Beneficial reuse (EOR) or geological (Alberta Saline Aquifer Project) 1.2 Mtpa
48 RWE Goldenbergwerk (Huerth) North Rhine-Westphalia, Germany 2015 360 MW net IGCC (coal) power plant Pre-combustion Pipeline Geological (saline aquifer) 2.8 Mtpa
49 HECA IGCC California, USA 2015 390 MW gross IGCC (petcoke/coal) power plant Pre-combustion 6.4 km Pipeline Beneficial reuse (EOR) 1.8 Mtpa
50 FutureGen Illinois, USA 2018 275 MW IGCC (coal) power plant Pre-combustion Pipeline Geological (saline aquifer) 1.0 Mtpa
51 Quest CCS Project (D) Alberta, Canada TBD / not specified Oil refinery Oil refining 10-60 km Pipeline Beneficial reuse (EOR) 1.2 Mtpa
52 SWP Deep Saline Sequestration (D) Utah, USA TBD / not specified Gas Processing NG Processing Pipeline Geological 1.0 Mtpa
53 Big Sky Development Test (Moxa Arch) (D) Wyoming, USA TBD / not specified Petroleum or natural gas processing Oil refining or NG processing Pipeline Geological (saline aquifer) 1.0 Mtpa

 

Table A-4 Active or planned, commercial scale, integrated projects at the Execute stage

Ref. No Project Name State/District, Country Estimated Operation Date Capture Facility Capture Type Transport Type Storage Type Approx. CO2 Storage Rates
54 Husky CO2 Injection Alberta, Canada 2012 Oil refining Oil refining Pipeline Beneficial reuse (EOR) TBD / not specified
55 Enhance Energy Pipeline and EOR Project (D) (S) Alberta, Canada TBD / not specified Fertiliser and oil refining Oil refining and fertiliser production 240 km Pipeline (Alberta Carbon Trunk Line) Beneficial reuse (EOR) 1.8 Mtpa (initial)

 

Table A-5 Active or planned, commercial scale, integrated projects at the Operate stage

Ref. No Project Name State/District, Country Estimated Operation Date Capture Facility Capture Type Transport Type Storage Type Approx. CO2 Storage Rates
56 Rangely EOR Project (D) Colorado, USA 1986 Shute Creek gas processing facility NG processing 285 km Pipeline Beneficial reuse (EOR) 1.0 Mtpa
57 Sleipner North Sea, Norway 1996 CO2 separated from produced gas – gas processing platform NG processing Pipeline (capture and storage at same location) Geological (saline aquifer) (16.3 Mt stored at the end of 2008) 1.0 Mtpa
58 Val Verde CO2 Pipeline (D) (S) Texas, USA 1998 Five natural gas processing plants NG processing 132km Pipeline Beneficial reuse (EOR) 1.0 Mtpa
59 Weyburn Operations (D) Saskatchewan, Canada 2000 (using CO2 as flooding agent) Great Plains Synfuels plant, Dakota Gasification Pre-combustion 330 km Pipeline Beneficial reuse (EOR) 2.4 Mtpa
60 In Salah Ouargla, Algeria 2004 Natural gas processing plant NG processing 14 km Pipeline Geological (3.0 Mt stored to date) 1.2 Mtpa
61 Salt Creek EOR (D) Wyoming, USA 2006 Shute Creek gas processing facility NG processing 201 km Pipeline Beneficial reuse (EOR) 2.4 Mtpa
62 Snøhvit CO2 Injection Barents Sea, Norway 2007 Snøhvit LNG Plant NG processing 160 km Pipeline Geological 0.7 Mtpa