Appendix E: Detailed Build Plan in Renewable Scenario

TRANSMISSION PROJECTS

Dorsale

2013 Ghana to Togo/Benin 655 MW

2017 Cote d'Ivoire to Ghana 655 MW

CLSG

2015 Cote d'Ivoire to Liberia 338 MW, Liberia to Guinea 338 MW, Liberia to Sierra Leone 303 MW, Sierra Leone to Guinea 334 MW

OMVG

2017 Senegal to Guinea 286 MW, Senegal to Gambia 341 MW, Guinea to Senegal 286 MW, Gambia to Senegal 341 MW

Hub Intrazonal

2012 Mali to Cote d'Ivoire 320 MW

2013 Ghana to Burkina Faso 332 MW

2015 Ghana to Burkina Faso 332 MW

2016 Guinea to Mali 95MW

Dorsale Mediane

2026 Nigeria to Togo/Benin 67MW

2030 Nigeria to Togo/Benin 418MW

Nigeria – Benin

2025 Nigeria to Togo/Benin 43MW

2026 Nigeria to Togo/Benin 286MW

Central Africa – Nigeria

2025 Central Africa to Nigeria 1 000 MW

2026 Central Africa to Nigeria 1 000 MW

2027 Central Africa to Nigeria 1 000 MW

2028 Central Africa to Nigeria 1 000 MW

2029 Central Africa to Nigeria 1 000 MW

2030 Central Africa to Nigeria 1 000 MW

GENERATION PROJECTS BY COUNTRY Burkina Faso

Centralised

» 2010 Unserved 10MW

» 2011 Komsilga 56MW

» 2012 Bobo 2 20MW

» 2013 Komsilga 36MW

» 2014 Bulk Wind (30% CF) 29MW

» 2020 Biomass 12MW

» 2021 Biomass 26MW

» 2022 Biomass 24MW, Solar PV (utility) 79MW

» 2023 Biomass 22MW, Solar PV (utility) 5MW

» 2024 Biomass 22MW, Solar PV (utility) 6MW

» 2025 Biomass 30MW, Solar PV (utility) 6MW

» 2026 Biomass 24MW, Solar PV (utility) 6MW

» 2027 Biomass 17MW, Solar PV (utility) 7MW, Solar thermal no storage 26MW

» 2028 Solar PV (utility) 7MW, Solar thermal no storage 108MW

» 2029 Solar thermal no storage 150MW

» 2030 Solar thermal no storage 83MW

De-Centralised

» 2010 Diesel/Gasoline 1kW system (Urban) 1MW

» 2012 Diesel/Gasoline 1kW system (Urban) 4MW

» 2013 Diesel/Gasoline 1kW system (Rural) 1MW, Diesel/Gasoline 1kW system (Urban) 11MW

» 2014 Small Hydro 4MW, Diesel/Gasoline 1kW system (Urban) 11MW

» 2015 Small Hydro 1MW

» 2016 Small Hydro 2MW

» 2017 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 3MW

» 2018 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 2MW, Diesel/Gasoline 1kW system (Urban) 3MW

» 2019 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 2MW, Diesel/Gasoline 1kW system (Urban) 5MW

» 2020 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 3MW, Diesel/Gasoline 1kW system (Urban) 11MW

» 2021 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 2MW, Diesel/Gasoline 1kW system (Urban) 3MW

» 2022 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 3MW, Diesel/Gasoline 1kW system (Urban) 2MW

» 2023 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 3MW, Diesel/Gasoline 1kW system (Urban) 15MW

» 2024 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 4MW, Diesel/Gasoline 1kW system (Urban) 16MW

» 2025 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 4MW, Diesel/Gasoline 1kW system (Urban) 5MW

» 2026 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 4MW, Diesel/Gasoline 1kW system (Urban) 5MW

» 2027 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 8MW, Diesel/Gasoline 1kW system (Urban) 4MW

» 2028 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 6MW, Diesel/Gasoline 1kW system (Urban) 7MW

» 2029 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 2MW, Diesel/Gasoline 1kW system (Urban) 3MW

» 2030 Diesel/Gasoline 1kW system (Rural) 3MW, Small Hydro 6MW, Diesel/Gasoline 1kW system (Urban) 12MW, Rooftop PV with 1h Battery 64MW

Cote d'Ivoire

Centralised

» 2010 Unserved 28MW

» 2013 5e centrale IPP (Bassam) 430MW, Lushann 100MW

» 2014 Vridi (CIPREL) 222MW, 4e centrale IPP (Abbata) 150MW

» 2015 Vridi (CIPREL) 111MW, 4e centrale IPP (Abbata) 150MW

» 2016 4e centrale IPP (Abbata) 150MW, CCGT 1000MW

» 2017 CCGT 268MW

» 2024 Solar PV (utility) 112MW

» 2026 Solar PV (utility) 468MW

» 2027 Solar PV (utility) 29MW

» 2028 Boutoubré 156MW, Solar PV (utility) 30MW

» 2029 Solar PV (utility) 30MW

» 2030 Tiboto/Cavally(Intl.)partCI50% 113MW, Solar PV (utility) 25MW

De-Centralised

» 2011 Diesel/Gasoline 1kW system (Rural) 6MW, Diesel/Gasoline 1kW system (Urban) 26MW

» 2012 Diesel/Gasoline 1kW system (Urban) 86MW

» 2014 Small Hydro 25MW, Diesel/Gasoline 1kW system (Urban) 27MW

» 2015 Small Hydro 3MW, Diesel/Gasoline 1kW system (Urban) 24MW

» 2016 Small Hydro 8MW, Diesel/Gasoline 1kW system (Urban) 23MW

» 2017 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 7MW, Diesel/Gasoline 1kW system (Urban) 23MW

» 2018 Diesel/Gasoline 1kW system (Rural) 5MW, Small Hydro 1MW, Diesel/Gasoline 1kW system (Urban) 23MW

» 2019 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 5MW, Diesel/Gasoline 1kW system (Urban) 23MW

» 2020 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 3MW, Diesel/Gasoline 1kW system (Urban) 9MW

» 2021 Diesel/Gasoline 1kW system (Rural) 7MW, Small Hydro 11MW, Diesel/Gasoline 1kW system (Urban) 38MW

» 2022 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 8MW, Diesel/Gasoline 1kW system (Urban) 98MW

» 2023 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 8MW, Diesel/Gasoline 1kW system (Urban) 13MW

» 2024 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 9MW

» 2025 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 3MW

» 2026 Diesel/Gasoline 1kW system (Rural) 3MW, Small Hydro 9MW

» 2027 Diesel/Gasoline 1kW system (Rural) 4MW, Small Hydro 10MW

» 2028 Diesel/Gasoline 1kW system (Rural) 7MW, Small Hydro 12MW

» 2029 Diesel/Gasoline 1kW system (Rural) 5MW, Small Hydro 20MW

» 2030 Diesel/Gasoline 1kW system (Rural) 4MW, Small Hydro 12MW, Diesel/Gasoline 1kW system (Urban) 83MW

Gambia

Centralised

» 2012 Brikama 16MW, Batokunku 1MW

» 2014 Biomass 7MW, Bulk Wind (30% CF) 5MW, Solar PV (utility) 11MW

» 2015 CCGT 60MW, Biomass 6MW, Solar PV (utility) 5MW

» 2016 Solar PV (utility) 15MW

» 2019 Solar PV (utility) 3MW

» 2021 Kaleta(OMVG)partGambie12% 1MW, Solar PV (utility) 2MW

» 2022 Kaleta(OMVG)partGambie12% 5MW, Solar PV (utility) 1MW

» 2023 Kaleta(OMVG)partGambie12% 5MW, Solar PV (utility) 1MW

» 2024 Kaleta(OMVG)partGambie12% 6MW, Solar PV (utility) 1MW

» 2025 Kaleta(OMVG)partGambie12% 6MW, Solar PV (utility) 1MW

» 2026 Kaleta(OMVG)partGambie12% 6MW, Solar PV (utility) 1MW

» 2027 Kaleta(OMVG)partGambie12% 1MW, FelloSounga(OMVG)partGambie12% 9MW, Solar PV (utility) 2MW

» 2028 Solar PV (utility) 2MW, Solar thermal no storage 22MW

» 2029 Solar thermal no storage 23MW

» 2030 Solar thermal no storage 31MW

De-Centralised

» 2012 Diesel/Gasoline 1kW system (Urban) 6MW

» 2013 Diesel/Gasoline 1kW system (Rural) 1MW, Diesel/Gasoline 1kW system (Urban) 7MW

» 2014 Small Hydro 2MW, Diesel/Gasoline 1kW system (Urban) 3MW

» 2015 Small Hydro 1MW

» 2016 Small Hydro 2MW

» 2017 Diesel/Gasoline 1kW system (Urban) 1MW

» 2018 Small Hydro 1MW, Diesel/Gasoline 1kW system (Urban) 1MW

» 2019 Small Hydro 1MW, Diesel/Gasoline 1kW system (Urban) 1MW

» 2020 Small Hydro 1MW, Diesel/Gasoline 1kW system (Urban) 2MW

» 2021 Small Hydro 1MW, Diesel/Gasoline 1kW system (Urban) 1MW

» 2022 Small Hydro 1MW, Diesel/Gasoline 1kW system (Urban) 7MW

» 2023 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 1MW, Diesel/Gasoline 1kW system (Urban) 7MW

» 2024 Small Hydro 1MW, Diesel/Gasoline 1kW system (Urban) 4MW

» 2025 Diesel/Gasoline 1kW system (Urban) 1MW

» 2026 Diesel/Gasoline 1kW system (Urban) 1MW

» 2027 Diesel/Gasoline 1kW system (Rural) 1MW, Diesel/Gasoline 1kW system (Urban) 2MW

» 2028 Diesel/Gasoline 1kW system (Rural) 1MW, Diesel/Gasoline 1kW system (Urban) 2MW

» 2029 Diesel/Gasoline 1kW system (Rural) 1MW, PV with 1h Battery (roof top - rural) 1MW, Diesel/Gasoline 1kW system (Urban) 2MW

» 2030 Diesel/Gasoline 1kW system (Rural) 1MW, PV with 2h Battery (roof top - rural) 4MW, Rooftop PV with 1h Battery 20MW

Ghana

Centralised

» 2012 Aboadze T3 phase-1 120 MW, Tema T1 110 MW, 10 MW

» 2013 Sunon Asogli phase-2 327 MW, Bui 342 MW

» 2014 Aboadze T2 330 MW, 50 MW, Bulk Wind (30% CF) 9 MW

» 2015 Tema T1 220 MW, 100 MW, Aboadze T4 (WAPP) 400 MW

» 2022 Biomass 1 MW

» 2023 Biomass 393 MW, Solar PV (utility) 204 MW

» 2024 Biomass 373 MW, Solar PV (utility) 500 MW

» 2025 Solar PV (utility) 359 MW

» 2026 Biomass 223 MW, Solar PV (utility) 61 MW

» 2027 Hemang 93 MW, OCGT 114 MW, Biomass 10 MW, Solar PV (utility) 55 MW

» 2028 OCGT 235 MW, Solar PV (utility) 65 MW

» 2029 OCGT 255 MW, Solar PV (utility) 67 MW

» 2030 OCGT 143 MW, Solar PV (utility) 12 MW

De-Centralised

» 2014 Small Hydro 1 MW, Diesel/Gasoline 1 kW system (Urban) 118 MW

» 2015 Diesel/Gasoline 1 kW system (Urban) 63 MW

» 2016 Diesel/Gasoline 1 kW system (Rural) 6 MW, Diesel/Gasoline 1 kW system (Urban) 65 MW

» 2017 Diesel/Gasoline 1 kW system (Rural) 5 MW, Diesel/Gasoline 1 kW system (Urban) 65 MW

» 2018 Diesel/Gasoline 1 kW system (Rural) 6 MW, Diesel/Gasoline 1 kW system (Urban) 66 MW

» 2019 Diesel/Gasoline 1 kW system (Rural) 6 MW, Diesel/Gasoline 1 kW system (Urban) 66 MW

» 2020 Diesel/Gasoline 1 kW system (Rural) 4 MW, Diesel/Gasoline 1 kW system (Urban) 41 MW

» 2021 Diesel/Gasoline 1 kW system (Rural) 3 MW, Diesel/Gasoline 1 kW system (Urban) 23 MW

» 2022 Diesel/Gasoline 1 kW system (Rural) 3 MW, PV with 1h Battery (rooftop - rural) 9 MW, Diesel/Gasoline 1 kW system (Urban) 24 MW

» 2023 Diesel/Gasoline 1 kW system (Rural) 4 MW, PV with 1h Battery (rooftop - rural) 1 MW, Diesel/Gasoline 1 kW system (Urban) 25 MW

» 2024 Diesel/Gasoline 1 kW system (Rural) 4 MW, PV with 1h Battery (rooftop - rural) 2 MW, Diesel/Gasoline 1 kW system (Urban) 91 MW

» 2025 Diesel/Gasoline 1 kW system (Rural) 5 MW, Diesel/Gasoline 1 kW system (Urban) 107 MW

» 2026 Diesel/Gasoline 1 kW system (Rural) 11 MW, PV with 1h Battery (rooftop - rural) 1 MW, Diesel/Gasoline 1 kW system (Urban) 110 MW

» 2027 PV with 1h Battery (rooftop - rural) 94 MW, Diesel/Gasoline 1 kW system (Urban) 111 MW

» 2028 Diesel/Gasoline 1 kW system (Rural) 19 MW, PV with 2h Battery (rooftop - rural) 35 MW, Diesel/Gasoline 1 kW system (Urban) 106 MW

» 2029 Diesel/Gasoline 1 kW system (Rural) 10 MW, PV with 2h Battery (rooftop - rural) 62 MW, Diesel/Gasoline 1 kW system (Urban) 102 MW

» 2030 PV with 2h Battery (rooftop - rural) 87 MW, Diesel/Gasoline 1 kW system (Urban) 1 MW, Rooftop PV with 1h Battery 604 MW

Guinea

Centralised

» 2012 Tombo 3 (Rehab.)2012 66MW

» 2013 Tombo 3 (Rehab.)2013 35MW

» 2014 Maneah 126MW, Biomass 20MW

» 2015 Baneah(Rehab) 5MW, Donkéa(Réhab) 15MW, GrandesChutes(Réhab) 27MW, Kaleta(OMVG)partGuinée40% 240MW, Biomass 21MW

» 2016 Biomass 22MW, Solar PV (utility) 184MW

» 2019 DAMEnvisagée 586MW, Solar PV (utility) 6MW

» 2020 DAMEnvisagée 586MW

» 2021 DAMEnvisagée 586MW

» 2022 DAMEnvisagée 586MW

» 2023 DAMEnvisagée 586MW

» 2026 Solar PV (utility) 127MW

» 2027 Solar PV (utility) 5MW

» 2028 Solar PV (utility) 5MW

» 2029 Solar PV (utility) 5MW

» 2030 Solar PV (utility) 4MW

De-Centralised

» 2010 Diesel/Gasoline 1kW system (Urban) 4MW

» 2011 Diesel/Gasoline 1kW system (Rural) 1MW, Diesel/Gasoline 1kW system (Urban) 5MW

» 2014 Small Hydro 6MW, Diesel/Gasoline 1kW system (Urban) 6MW

» 2015 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 6MW, Diesel/Gasoline 1kW system (Urban) 20MW

» 2016 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 8MW, Diesel/Gasoline 1kW system (Urban) 10MW

» 2017 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 2MW, Diesel/Gasoline 1kW system (Urban) 6MW

» 2018 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 7MW, Diesel/Gasoline 1kW system (Urban) 6MW

» 2019 Diesel/Gasoline 1kW system (Rural) 3MW, Small Hydro 10MW, Diesel/Gasoline 1kW system (Urban) 5MW

» 2020 Diesel/Gasoline 1kW system (Rural) 4MW, Small Hydro 15MW, Diesel/Gasoline 1kW system (Urban) 5MW

» 2021 Diesel/Gasoline 1kW system (Rural) 3MW, Small Hydro 7MW, Diesel/Gasoline 1kW system (Urban) 7MW

» 2022 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 7MW, Diesel/Gasoline 1kW system (Urban) 1MW

» 2023 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 7MW, Diesel/Gasoline 1kW system (Urban) 1MW

» 2024 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 7MW

» 2025 Diesel/Gasoline 1kW system (Rural) 3MW, Small Hydro 1MW

» 2026 Diesel/Gasoline 1kW system (Rural) 3MW, Small Hydro 7MW

» 2027 Diesel/Gasoline 1kW system (Rural) 4MW, Small Hydro 7MW

» 2028 Diesel/Gasoline 1kW system (Rural) 4MW, Small Hydro 7MW

» 2029 Diesel/Gasoline 1kW system (Rural) 5MW, Small Hydro 7MW

» 2030 Diesel/Gasoline 1kW system (Rural) 6MW, Small Hydro 9MW

Guinea-Bissau

Centralised

» 2010 Unserved 20MW

» 2012 Unserved 4MW, Bissau 15MW

» 2013 Solar PV (utility) 6MW

» 2014 OCGT 4MW, Biomass 1MW

» 2015 CCGT 17MW, Biomass 2MW

» 2016 CCGT 43MW, Biomass 2MW, Solar PV (utility) 17MW

» 2017 Biomass 2MW

» 2018 Kaleta(OMVG)partGuinéeBissau8% 2MW, Biomass 2MW, Solar PV (utility) 4MW

» 2019 Kaleta(OMVG)partGuinéeBissau8% 3MW, OCGT 4MW, Biomass 2MW, Solar PV (utility) 2MW

» 2020 OCGT 51MW, Biomass 2MW, Solar PV (utility) 17MW

» 2021 OCGT 7MW, Biomass 2MW, Solar PV (utility) 2MW

» 2022 OCGT 1MW, Biomass 2MW, Solar PV (utility) 1MW

» 2023 OCGT 1MW, Biomass 3MW, Solar PV (utility) 1MW

» 2024 OCGT 2MW, Biomass 3MW, Solar PV (utility) 1MW

» 2025 OCGT 2MW, Biomass 3MW, Solar PV (utility) 1MW

» 2026 OCGT 2MW, Biomass 3MW, Solar PV (utility) 1MW

» 2027 Biomass 3MW, Solar PV (utility) 1MW, Solar thermal no storage 6MW

» 2028 Biomass 4MW, Solar PV (utility) 1MW, Solar thermal no storage 6MW

» 2029 Biomass 2MW, Solar PV (utility) 2MW, Solar thermal no storage 16MW

» 2030 Solar PV (utility) 1MW, Solar thermal no storage 16MW

De-Centralised

» 2010 Diesel/Gasoline 1kW system (Urban) 3MW

» 2011 Diesel/Gasoline 1kW system (Urban) 4MW

» 2013 Solar PV (roof top) 1MW

» 2014 Small Hydro 1MW

» 2016 Small Hydro 1MW

» 2019 Diesel/Gasoline 1kW system (Rural) 1MW, Diesel/Gasoline 1kW system (Urban) 4MW

» 2020 Diesel/Gasoline 1kW system (Rural) 1MW, PV with 1h Battery (roof top - rural) 2MW, Diesel/Gasoline 1kW system (Urban) 5MW

» 2021 Diesel/Gasoline 1kW system (Rural) 1MW, PV with 1h Battery (roof top - rural) 2MW, Diesel/Gasoline 1kW system (Urban) 6MW

» 2022 PV with 1h Battery (roof top - rural) 2MW, Diesel/Gasoline 1kW system (Urban) 1MW

» 2023 PV with 1h Battery (roof top - rural) 2MW, Diesel/Gasoline 1kW system (Urban) 1MW

» 2024 PV with 1h Battery (roof top - rural) 1MW, Diesel/Gasoline 1kW system (Urban) 1MW

» 2025 PV with 1h Battery (roof top - rural) 1MW, Diesel/Gasoline 1kW system (Urban) 1MW

» 2026 PV with 1h Battery (roof top - rural) 1MW, Diesel/Gasoline 1kW system (Urban) 1MW

» 2027 PV with 1h Battery (roof top - rural) 1MW, Diesel/Gasoline 1kW system (Urban) 1MW

» 2028 Diesel/Gasoline 1kW system (Rural) 1MW, PV with 1h Battery (roof top - rural) 1MW, Diesel/Gasoline 1kW system (Urban) 1MW

» 2029 Diesel/Gasoline 1kW system (Urban) 6MW

» 2030 Diesel/Gasoline 1kW system (Rural) 1MW, PV with 2h Battery (roof top - rural) 2MW, Diesel/Gasoline 1kW system (Urban) 6MW

Liberia

Centralised

» 2011 Bushrod 10MW

» 2013 Bushrod 2 40MW, Kakata (Buchanan) 35MW

» 2014 OCGT 33MW, Biomass 1MW, Solar PV (utility) 37MW

» 2015 MountCoffee(+Viareservoir) 66MW, CCGT 70MW, Biomass 2MW

» 2016 OCGT 5MW, Biomass 2MW, Solar PV (utility) 52MW

» 2017 SaintPaul -1B 78MW, SaintPaul -2 120MW

» 2024 Solar PV (utility) 4MW

» 2025 Solar PV (utility) 1MW

» 2026 Solar PV (utility) 1MW

» 2027 Solar PV (utility) 1MW

» 2028 Solar PV (utility) 1MW

» 2029 Solar PV (utility) 1MW

» 2030 Solar PV (utility) 1MW

De-Centralised

» 2011 Diesel/Gasoline 1kW system (Urban) 2MW

» 2012 Diesel/Gasoline 1kW system (Urban) 4MW

» 2013 Solar PV (roof top) 1MW

» 2014 Small Hydro 1MW, Diesel/Gasoline 1kW system (Urban) 3MW, Solar PV (roof top) 1MW

» 2015 Small Hydro 1MW, Solar PV (roof top) 2MW

» 2016 Small Hydro 2MW, Diesel/Gasoline 1kW system (Urban) 2MW, Solar PV (roof top) 2MW

» 2017 Small Hydro 2MW

» 2018 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 2MW

» 2019 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 2MW

» 2020 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 2MW

» 2021 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 2MW, Diesel/Gasoline 1kW system (Urban) 2MW

» 2022 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 2MW, Diesel/Gasoline 1kW system (Urban) 4MW

» 2023 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 3MW, Diesel/Gasoline 1kW system (Urban) 1MW

» 2024 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 3MW

» 2025 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 3MW

» 2026 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 2MW

» 2027 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 3MW

» 2028 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 4MW

» 2029 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 4MW

» 2030 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 2MW

Mali

Centralised

» 2010 0 2MW

» 2011 0 2MW, SIKASSO (CO) 9MW, Balingue BID 60MW

» 2012 0 2MW, KOUTIALA (CI) 4MW, VICA BOOT 30MW, Albatros BOOT 92MW, Mopti SOLAR 10MW

» 2013 0 2MW, 27MW

» 2014 0 2MW, Sotuba2 6MW

» 2015 0 2MW, Kenié 34MW

» 2016 0 2MW

» 2017 0 2MW, Gouina(OMVS)partMali45% 63MW

» 2018 0 2MW, DAMEnvisagée 303MW

» 2019 0 2MW

» 2020 0 2MW

» 2021 0 2MW

» 2022 0 2MW, Solar PV (utility) 153MW

» 2023 0 2MW

» 2024 0 2MW, Solar PV (utility) 14MW

» 2025 0 2MW, Solar PV (utility) 7MW

» 2026 0 2MW, Solar PV (utility) 7MW

» 2027 0 2MW, Solar PV (utility) 7MW

» 2028 0 2MW, Solar PV (utility) 7MW

» 2029 0 2MW, Solar PV (utility) 8MW

» 2030 0 2MW, Solar PV (utility) 6MW

De-Centralised

» 2011 Diesel/Gasoline 1kW system (Rural) 1MW

» 2012 Diesel/Gasoline 1kW system (Urban) 4MW

» 2013 Diesel/Gasoline 1kW system (Rural) 1MW, Diesel/Gasoline 1kW system (Urban) 10MW

» 2014 Small Hydro 8MW, Diesel/Gasoline 1kW system (Urban) 33MW

» 2015 Small Hydro 2MW

» 2016 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 7MW, Diesel/Gasoline 1kW system (Urban) 11MW

» 2017 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 3MW

» 2018 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 3MW

» 2019 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 1MW

» 2020 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 6MW

» 2021 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 5MW

» 2022 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 5MW

» 2023 Diesel/Gasoline 1kW system (Rural) 3MW, Small Hydro 5MW

» 2024 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 6MW

» 2025 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 6MW

» 2026 Diesel/Gasoline 1kW system (Rural) 3MW, Small Hydro 6MW

» 2027 Diesel/Gasoline 1kW system (Rural) 3MW, Small Hydro 7MW

» 2028 Diesel/Gasoline 1kW system (Rural) 3MW

» 2029 Diesel/Gasoline 1kW system (Rural) 3MW

» 2030 Diesel/Gasoline 1kW system (Rural) 3MW

Niger

Centralised

» 2010 Unserved 115MW

» 2011 Niamey 2 15MW

» 2012 Unserved 68MW, TAG Niamey 2 10MW, Dossou 2MW, Tillabery 2MW, Gaya 1MW, Goudel 12MW

» 2013 Zinder 8MW

» 2014 Wind 30MW, Diesel Centralised 16MW, Biomass 21MW, Bulk Wind (30% CF) 71MW

» 2015 Kandadji 130MW, Bulk Wind (30% CF) 14MW

» 2016 Dyodyonga 26MW, Bulk Wind (30% CF) 5MW

» 2017 Bulk Wind (30% CF) 5MW

» 2018 Supercritical coal 111MW

» 2022 Bulk Wind (30% CF) 26MW

» 2023 Bulk Wind (30% CF) 6MW

» 2024 Bulk Wind (30% CF) 6MW

» 2027 Bulk Wind (30% CF) 17MW, Solar PV (utility) 89MW

» 2028 Bulk Wind (30% CF) 6MW, Solar PV (utility) 3MW

» 2029 Bulk Wind (30% CF) 5MW, Solar PV (utility) 3MW

» 2030 Bulk Wind (30% CF) 4MW, Solar PV (utility) 2MW

De-Centralised

» 2010 Diesel 100 kW system (industry) 1MW

» 2011 Diesel 100 kW system (industry) 4MW

» 2012 Diesel/Gasoline 1kW system (Rural) 1MW, Diesel/Gasoline 1kW system (Urban) 11MW

» 2013 Diesel/Gasoline 1kW system (Urban) 13MW

» 2014 Small Hydro 6MW, Diesel/Gasoline 1kW system (Urban) 9MW

» 2016 Small Hydro 2MW

» 2017 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 2MW

» 2018 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 2MW

» 2019 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 1MW

» 2020 Small Hydro 2MW

» 2021 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 2MW

» 2022 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 3MW

» 2023 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 3MW

» 2024 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 3MW

» 2025 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 1MW

» 2026 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 3MW

» 2027 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 3MW, Diesel/Gasoline 1kW system (Urban) 8MW

» 2028 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 3MW, Diesel/Gasoline 1kW system (Urban) 8MW

» 2029 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 6MW, Diesel/Gasoline 1kW system (Urban) 8MW

» 2030 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 6MW, Diesel/Gasoline 1kW system (Urban) 5MW

Nigeria

Centralised

» 2011 GT 2011 2953MW

» 2012 GT 2012 4126MW

» 2013 GT 2013 1452MW

» 2015 CCGT 1500MW, Bulk Wind (30% CF) 363MW

» 2016 CCGT 1600MW

» 2017 Mambilla 2600MW, CCGT 1700MW

» 2018 Zungeru 700MW, CCGT 1800MW

» 2019 CCGT 1900MW

» 2020 CCGT 1256MW, Hydro 1000MW

» 2021 CCGT 241MW, Hydro 1000MW

» 2022 CCGT 25MW, Hydro 1000MW

» 2023 Hydro 1000MW

» 2024 Hydro 1000MW

» 2025 Hydro 1000MW

» 2026 Hydro 842MW

De-Centralised

» 2011 Diesel/Gasoline 1kW system (Rural) 7MW, Diesel/Gasoline 1kW system (Urban) 1113MW

» 2012 Diesel/Gasoline 1kW system (Rural) 45MW, Diesel/Gasoline 1kW system (Urban) 557MW

» 2013 Diesel/Gasoline 1kW system (Rural) 47MW, Diesel/Gasoline 1kW system (Urban) 47MW

» 2014 Small Hydro 215MW, Diesel/Gasoline 1kW system (Urban) 50MW

» 2015 Small Hydro 33MW, Diesel/Gasoline 1kW system (Urban) 48MW

» 2016 Small Hydro 116MW, Diesel/Gasoline 1kW system (Urban) 67MW

» 2017 Diesel/Gasoline 1kW system (Rural) 26MW, Small Hydro 139MW, Diesel/Gasoline 1kW system (Urban) 66MW

» 2018 Diesel/Gasoline 1kW system (Rural) 28MW, Small Hydro 105MW, Diesel/Gasoline 1kW system (Urban) 64MW

» 2019 Diesel/Gasoline 1kW system (Rural) 31MW, Small Hydro 57MW, Diesel/Gasoline 1kW system (Urban) 62MW

» 2020 Diesel/Gasoline 1kW system (Rural) 31MW, Small Hydro 110MW, Diesel/Gasoline 1kW system (Urban) 43MW

» 2021 Diesel/Gasoline 1kW system (Rural) 46MW, Small Hydro 141MW, Diesel/Gasoline 1kW system (Urban) 1239MW

» 2022 Diesel/Gasoline 1kW system (Rural) 85MW, Small Hydro 222MW, Diesel/Gasoline 1kW system (Urban) 655MW

» 2023 Diesel/Gasoline 1kW system (Rural) 90MW, Small Hydro 168MW

» 2024 Diesel/Gasoline 1kW system (Rural) 48MW, Small Hydro 184MW

» 2025 Diesel/Gasoline 1kW system (Rural) 52MW, Small Hydro 83MW

» 2026 Diesel/Gasoline 1kW system (Rural) 54MW, Small Hydro 195MW

» 2027 Diesel/Gasoline 1kW system (Rural) 82MW, Small Hydro 205MW

» 2028 Diesel/Gasoline 1kW system (Rural) 88MW, Small Hydro 215MW

» 2029 Diesel/Gasoline 1kW system (Rural) 93MW, Small Hydro 224MW » 2030 Diesel/Gasoline 1kW system (Rural) 74MW, Small Hydro 156MW

Senegal

Centralised

» 2011 Location 150MW

» 2012 belair 30MW

» 2013 Felou(OMVS)partSénégal15% 15MW

» 2014 ross betio 30MW, Biomass 62MW, Bulk Wind (30% CF) 232MW

» 2015 Biomass 66MW, Bulk Wind (30% CF) 29MW, Solar PV (utility) 157MW

» 2016 Sendou 250MW, Biomass 66MW, Bulk Wind (30% CF) 38MW

» 2017 Sambangalou(OMVG)partSénégal40% 51MW, Gouina(OMVS)partSénégal25% 35MW, Bulk Wind (30% CF) 15MW

» 2018 Biomass 53MW, Bulk Wind (30% CF) 15MW

» 2019 Biomass 3MW, Bulk Wind (30% CF) 16MW

» 2020 Bulk Wind (30% CF) 18MW

» 2021 Bulk Wind (30% CF) 21MW, Solar PV (utility) 74MW

» 2022 Bulk Wind (30% CF) 20MW, Solar PV (utility) 12MW

» 2023 Bulk Wind (30% CF) 21MW, Solar PV (utility) 13MW

» 2024 Bulk Wind (30% CF) 23MW, Solar PV (utility) 14MW

» 2025 Bulk Wind (30% CF) 24MW, Solar PV (utility) 14MW

» 2026 Bulk Wind (30% CF) 25MW, Solar PV (utility) 15MW

» 2027 Bulk Wind (30% CF) 25MW, Solar PV (utility) 15MW

» 2028 Kaleta(OMVG)partSénégal40% 1MW, Bulk Wind (30% CF) 27MW, Solar PV (utility) 16MW, Solar thermal no storage 142MW

» 2029 Bulk Wind (30% CF) 30MW, Solar PV (utility) 18MW, Solar thermal no storage 251MW

» 2030 Kaleta(OMVG)partSénégal40% 3MW, Bulk Wind (30% CF) 26MW, Solar PV (utility) 16MW, Solar thermal no storage 123MW

De-Centralised

» 2010 Diesel/Gasoline 1kW system (Rural) 1MW, Diesel/Gasoline 1kW system (Urban) 3MW

» 2012 Diesel/Gasoline 1kW system (Urban) 49MW

» 2013 Diesel/Gasoline 1kW system (Rural) 3MW, Diesel/Gasoline 1kW system (Urban) 13MW

» 2014 Small Hydro 11MW, Diesel/Gasoline 1kW system (Urban) 8MW

» 2016 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 10MW, Diesel/Gasoline 1kW system (Urban) 18MW

» 2017 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 5MW, Diesel/Gasoline 1kW system (Urban) 8MW

» 2018 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 5MW, Diesel/Gasoline 1kW system (Urban) 8MW

» 2019 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 6MW, Diesel/Gasoline 1kW system (Urban) 8MW

» 2020 Diesel/Gasoline 1kW system (Rural) 3MW, Small Hydro 6MW, Diesel/Gasoline 1kW system (Urban) 7MW

» 2021 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 6MW, Diesel/Gasoline 1kW system (Urban) 5MW

» 2022 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 6MW, Diesel/Gasoline 1kW system (Urban) 54MW

» 2023 Diesel/Gasoline 1kW system (Rural) 5MW, Small Hydro 7MW, Diesel/Gasoline 1kW system (Urban) 18MW

» 2024 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 8MW, Diesel/Gasoline 1kW system (Urban) 13MW

» 2025 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 8MW, Diesel/Gasoline 1kW system (Urban) 20MW

» 2026 Diesel/Gasoline 1kW system (Rural) 3MW, Small Hydro 8MW

» 2027 Diesel/Gasoline 1kW system (Rural) 4MW, Small Hydro 9MW, Diesel/Gasoline 1kW system (Urban) 26MW

» 2028 Diesel/Gasoline 1kW system (Rural) 4MW, Small Hydro 4MW, Diesel/Gasoline 1kW system (Urban) 23MW

» 2029 Diesel/Gasoline 1kW system (Rural) 5MW

» 2030 Diesel/Gasoline 1kW system (Rural) 6MW, Diesel/Gasoline 1kW system (Urban) 24MW

Sierra Leone

Centralised

» 2013 Diesel Centralised 3MW, Solar PV (utility) 16MW

» 2014 OCGT 120MW, Biomass 6MW, Solar PV (utility) 41MW

» 2015 Bumbuna2 40MW, CCGT 111MW, Biomass 6MW, Solar PV (utility) 4MW

» 2016 Biomass 6MW, Solar PV (utility) 35MW

» 2017 Bumbuna3(Yiben) 90MW, Bumbuna4&5 95MW, Biomass 7MW, Solar PV (utility) 33MW

» 2018 Energeon 100MW, Addax 15MW, Biomass 7MW

» 2019 Biomass 8MW, Solar PV (utility) 79MW

» 2020 Benkongor1 35MW, Biomass 8MW, Solar PV (utility) 41MW

» 2021 Biomass 9MW, Solar PV (utility) 1MW

» 2022 Benkongor2 80MW

» 2024 Solar PV (utility) 9MW

» 2025 Benkongor3 86MW, Solar PV (utility) 1MW

» 2026 DAMEnvisagée 323MW, Solar PV (utility) 1MW

» 2027 Solar PV (utility) 1MW

» 2028 Solar PV (utility) 1MW

» 2029 Solar PV (utility) 1MW

De-Centralised

» 2011 Diesel 100 kW system (industry) 38MW, Diesel/Gasoline 1kW system (Urban) 7MW

» 2012 Diesel 100 kW system (industry) 1MW, Diesel/Gasoline 1kW system (Urban) 7MW

» 2013 Diesel 100 kW system (industry) 37MW, Diesel/Gasoline 1kW system (Rural) 1MW, Diesel/Gasoline 1kW system (Urban) 10MW, Solar PV (roof top) 5MW

» 2014 Small Hydro 4MW, Solar PV (roof top) 6MW

» 2015 Small Hydro 1MW, Solar PV (roof top) 1MW

» 2016 Small Hydro 6MW, Solar PV (roof top) 6MW

» 2017 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 6MW, Diesel/Gasoline 1kW system (Urban) 1MW

» 2018 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 7MW, Diesel/Gasoline 1kW system (Urban) 1MW

» 2019 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 8MW, Solar PV (roof top) 8MW

» 2020 Diesel/Gasoline 1kW system (Rural) 5MW, Small Hydro 8MW, Solar PV (roof top) 8MW

» 2021 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 8MW

» 2022 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 5MW

» 2023 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 1MW

» 2024 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 8MW

» 2025 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 2MW

» 2026 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 4MW

» 2027 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 8MW

» 2028 Diesel/Gasoline 1kW system (Rural) 3MW, Small Hydro 7MW

» 2029 Diesel/Gasoline 1kW system (Rural) 4MW, Small Hydro 2MW

Togo/Benin

Centralised

» 2010 Unserved 147MW

» 2011 CAI 80MW

» 2012 Unserved 51MW, IPP_SOLAR 20MW

» 2013 IPP_WIND 20MW, IPP_THERMAL 54MW

» 2014 OCGT 39MW, Biomass 46MW

» 2015 MariaGleta 450MW

» 2017 Adjarala 147MW

» 2023 Biomass 51MW, Solar PV (utility) 171MW

» 2024 Biomass 92MW, Solar PV (utility) 113MW

» 2026 Biomass 72MW, Solar PV (utility) 39MW

» 2027 Biomass 92MW, Solar PV (utility) 21MW

» 2028 Biomass 99MW, Solar PV (utility) 22MW

» 2029 Biomass 125MW, Solar PV (utility) 23MW

» 2030 Biomass 124MW, Solar PV (utility) 18MW

De-Centralised

» 2010 Diesel/Gasoline 1kW system (Rural) 1MW, Diesel/Gasoline 1kW system (Urban) 4MW

» 2011 Diesel 100 kW system (industry) 9MW, Diesel/Gasoline 1kW system (Rural) 2MW, Diesel/Gasoline 1kW system (Urban) 47MW

» 2012 Diesel/Gasoline 1kW system (Urban) 70MW

» 2014 Small Hydro 17MW, Diesel/Gasoline 1kW system (Urban) 6MW

» 2016 Small Hydro 2MW

» 2017 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 3MW

» 2018 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 2MW

» 2019 Diesel/Gasoline 1kW system (Rural) 1MW

» 2020 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 2MW, Diesel/Gasoline 1kW system (Urban) 11MW

» 2021 Diesel/Gasoline 1kW system (Rural) 3MW, Small Hydro 6MW, Diesel/Gasoline 1kW system (Urban) 55MW

» 2022 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 4MW, Diesel/Gasoline 1kW system (Urban) 79MW

» 2023 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 5MW, Diesel/Gasoline 1kW system (Urban) 9MW

» 2024 Diesel/Gasoline 1kW system (Rural) 1MW, Small Hydro 5MW, Diesel/Gasoline 1kW system (Urban) 1MW

» 2025 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 6MW, Diesel/Gasoline 1kW system (Urban) 13MW

» 2026 Diesel/Gasoline 1kW system (Rural) 2MW, Small Hydro 6MW, Diesel/Gasoline 1kW system (Urban) 13MW

» 2027 Diesel/Gasoline 1kW system (Rural) 3MW, Small Hydro 7MW