2.6 Comparison

Each of the projects discussed above involve different development plans, operator preferences, geological and economic conditions. In comparing projects with each other and with the case studies in this report, it is important to keep these differences in mind. Table 1 highlights some of the differences between the projects discussed in this section.

Table 1 – Comparison of features of existing CO2 injection projects

(ii) This injection rate includes recycled CO2

(iii) Minimum miscibility pressure